ESD floors installed to the facility’s written spec
ESD flooring usually comes with paperwork. A customer, an auditor or an equipment maker has put in writing what the floor in an electronics room, lab or server room needs to do, and Danny installs to that spec and the product data. Testing the finished floor stays with the facility’s own third party.


The short version of electrostatic dissipative (esd) flooring
An electrostatic dissipative floor is a resin system that moves static charge away from people and equipment at a controlled rate, then into the building’s grounding. The rate is set by the facility’s requirements, and the system is chosen to match them from the product data. It is installed in layers, with conductive materials in the build and grounding points that the facility’s electrician connects. Done right, it is one piece of a program that also includes footwear, workstation grounding and procedures.
Done right, it is one piece of a program that also includes footwear, workstation grounding and procedures.
An ESD floor is only as good as the spec behind it and the program around it. The facility owns the spec, the testing and the program. Danny installs the floor to the written requirements and the product data, and when a spec is unclear he asks questions and does not guess. He also looks at the room itself, its traffic and what gets spilled, since chemicals and heavy carts affect the choice too. Rooms that also need a light, clean look have fewer color choices.
Danny reads the spec first and goes over it with whoever owns it, often a quality or facilities manager. He walks the room and asks about the slab, the carts, the chemicals and the cleaning routine. The concrete is diamond ground and repaired, since cracks and bumps carry into the finished floor. Ground point locations are marked with the electrician. The system goes down in layers per the product data. After the cure and final walk, the facility’s third-party tester checks the floor against the spec. Danny pours with Bulletproof Resins material, mixed in small batches on the job so nothing sits in the bucket too long.
The spec belongs to the facility, and the floor gets installed to it.
How Danny does the job
Every floor goes through the same five stages. What changes is how much each one takes, and that gets settled at the walkthrough.

Walk the space
You and Danny walk it together. He looks at the surface and the moisture and talks through options.

Prep the concrete
Prep is grinding and cleaning, done until the concrete is ready to take a coating, not before.

Fix what is underneath
Repairs come before color. A crack left alone tends to come back through the floor.
Lay it down
Material gets mixed fresh and worked across the floor while it is still workable.
Cure and the final walk
After it cures, you and Danny walk the finished floor before anyone calls it done.
More of Danny’s floors
Other jobs from the file, not all of them this service. See the gallery








Questions about electrostatic dissipative (esd) flooring
What is the difference between ESD and conductive flooring?
Both move static to ground. They differ in how fast the charge moves, and each has its own range set by standards or the facility. Conductive floors are the stricter of the two, used where the rules call for them. The facility’s spec says which one the room needs, and Danny installs to that.
Can an ESD floor go over our old coating?
Usually the old coating comes off. An ESD system depends on its layers and grounding working together, and an old coating underneath can get in the way. The concrete gets diamond ground, repaired and then built up per the product data. Danny looks at the old floor on the walk before saying for sure.
Who confirms the floor meets our spec?
The facility’s own third-party tester. Danny installs the floor to the written requirements and the product data, then coordinates timing with the tester after the cure. If a reading comes in off, he works through it with the facility and the tester. Sign-off on the spec stays with the facility.
Why does the concrete get ground first?
A coating holds onto concrete by getting into the top of it. A smooth or sealed slab gives it nothing to grab, so grinding comes first and the dust gets vacuumed off.
Do you come out and look before anything gets decided?
Yes. Danny walks the space, checks the concrete and talks through what you want before anything is ordered or scheduled. Call (908) 577-7104 or send the form and he will set a time.
How far do you travel?
About 60 miles out from Cranford: North and Central Jersey, New York City and Long Island, Westchester, Rockland and Orange, Fairfield County in Connecticut, and Bucks, Montgomery, the Lehigh Valley and the Poconos.
Other performance work
Slip, chemical, impact, heat and static control. Danny looks at the space first and says what fits before anyone orders material.
- Anti-Slip Epoxy Floor SystemsEpoxy floors with grip broadcast into the finish, set heavier where floors get wet or greasy and lighter where carts roll.
- Chemical-Resistant Epoxy FlooringEpoxy floors matched to a facility’s own chemical list, with the resin and topcoat chosen from the product data for those spills.
- Acid-Resistant Floor SystemsFloor systems for battery rooms, cleaning stations and other spots where acid gets spilled, chosen from the product data for the acids involved.
- Oil-Resistant Floor CoatingsFloor coatings that keep motor oil, hydraulic fluid and cutting oils on the surface, with extra prep for oil already in the slab.
- High-Abrasion-Resistant FlooringResin floors chosen for wear in busy lanes, where carts, pallet jacks and tracked-in grit grind down ordinary coatings over time.
Every county Danny covers, and every town in them, has its own page. See every areaSee the gallery
Danz Handz
Danny Carrero, epoxy specialist
dhepoxy@gmail.com
Cranford, NJ. Mon to Sat, 8 to 6. Hablamos español.
Book a walkthrough
Tell Danny about the space. He calls you back, comes out, looks at the concrete and talks it through before anything gets decided.