Static-Dissipative floors for electronics work areas
In an electronics work area, the floor is one piece of a static-control plan that also covers footwear and benches. ESD resin carries charge from people and carts down to a ground. Danny starts from the plan your team already has and chooses the system to its requirements and the product data.


ESD Flooring, from Danny’s side of the job
An ESD floor is a resin system with conductive materials mixed into it, laid over prepared concrete and connected to the building’s ground through grounding points set into the floor. When a person wearing ESD footwear or a cart with the right wheels moves across it, static charge drains through the floor instead of building up and jumping to a part. It is one piece of a static-control program that includes footwear, wrist straps, mats and procedures. Danny chooses the system to the facility’s requirements and the product data.
Without the right footwear, a static-control floor does very little.
An ESD floor only works as part of the whole program. Without the right footwear, a static-control floor does very little. The facility’s own static-control plan sets the floor’s required performance, and the facility handles testing and verification against it. Danny does not state electrical ratings or certify floors. ESD floors also need the right cleaning products, since some floor polishes and cleaners can coat the surface and affect how it performs.
Danny starts with the facility’s static-control plan and floor specification, then walks the areas with the person responsible for ESD. He looks at the space, the traffic and what gets spilled on it before recommending a system. He confirms where grounding points will tie in. The slab is tested for moisture, diamond ground and repaired. Grounding is installed as specified, then the conductive system goes down in layers per the product data. The floor cures closed. The final walk is done with the facility’s ESD lead, who handles the facility’s own testing before the area goes back into use.
An ESD floor works only alongside the footwear and procedures around it.
From bare slab to finished floor
An ESD floor starts with its connection to building ground. These steps follow that connection from the facility’s static-control plan to the checks its own team runs on the finished floor.

Reading the static-control plan
Danny reads the facility’s static-control plan with the ESD coordinator to see which areas are protected and what the floor is expected to do there. The footwear and carts in use are part of that conversation, since the floor works together with them.

Marking where ground ties in
With the facility’s electrician or engineer, he picks where the floor will connect to building ground. Those points are marked on the plan and on the slab, spaced through each protected area so no part of the floor sits far from a connection.

Preparing a clean, dry slab
Moisture tests come first, then the slab is ground and repaired. Any old coating in the protected area usually comes off, since the conductive layers need full contact with properly prepared concrete and an even surface to spread across.
Laying the conductive layers
Grounding strips or plates are set at the marked points, then the conductive primer and the dissipative coat go down in the order the product data sets. Each layer has to stay continuous over the strips so charge has an unbroken path to ground.
Handing off to the ESD coordinator
Once the floor has cured, Danny walks the area with the ESD coordinator and shows where each ground connection sits. The facility runs its own checks, and staff get a list of floor cleaners that will not leave a film on the surface.
More of Danny’s floors
Other jobs from the file, not all of them this service. See the gallery








Questions about esd flooring
What does an ESD floor actually do?
It gives static charge a path to ground. When someone in ESD footwear walks across it, charge drains through the floor instead of building up on the person and discharging into a part. It works with footwear, wrist straps and procedures as part of your facility’s static-control program, which sets what the floor needs to do.
Do you test the floor after installation?
Your facility’s team handles testing and verification against your static-control plan. Danny installs the floor and grounding to your specification and the product data, and he coordinates with your ESD lead so testing can happen once the floor has cured. He does not certify floors or state electrical ratings.
Can an ESD floor be installed over an existing coating?
Usually the old coating needs to come off, since the ESD system has to tie into grounding and bond properly to the slab. Danny checks the existing floor during the walk. In some cases a well-bonded floor can be prepared and coated over, if the product data allows it, and he will say which applies.
Can carts and chairs in the protected area stay as they are?
Only if they already suit the plan. A cart with ordinary rubber wheels or a chair with standard casters will not pass charge to the floor, so many facilities switch to conductive wheels or add drag chains. Your static-control plan decides what equipment needs. Danny can point out items on the walk that may need a look.
Can a room be converted to ESD while part of it stays in use?
Usually, by working in sections. The protected area has to end up as one connected floor, so each section is planned to join the next with the ground ties in place. Workstations move into finished sections as the job goes. Danny lays out the order with your ESD coordinator before the first section is closed.
Do the ground connections need any upkeep?
They mostly need to be left alone. A connection point that gets struck by equipment, covered by a heavy cabinet or cut during later work can lose contact. Your team’s routine checks will show if an area stops performing. If a point is damaged, Danny can open it up and repair the tie-in.
More from the industries section
Auto, aviation, food, labs, schools, fitness, retail, parking and storage, matched to what actually hits the floor.
- Cultivation Facility FlooringRoom-by-room resin floors for indoor cultivation buildings, from wet grow rooms to trim, drying and packaging areas.
- Grow Room Floor CoatingsLight, coved resin floors for individual grow rooms, recoated in the window between harvest and the next planting.
- Electronics Manufacturing Floor CoatingsElectronics plant floors laid out from the floor plan, with static-control systems where parts are handled and general coatings elsewhere.
- Technical Room Floor CoatingsSealed resin floors for server, telecom, UPS and battery rooms, ground and coated in sections around equipment that keeps running.
- Static-Control FlooringResin floors tied to ground that reduce static buildup in print shops, packaging lines and offices where people keep getting shocked.
From Union County out to the Lehigh Valley, Long Island and Fairfield County, the work is all within about 60 miles of Cranford. See every areaSee the gallery
Danz Handz
Danny Carrero, epoxy specialist
dhepoxy@gmail.com
Cranford, NJ. Mon to Sat, 8 to 6. Hablamos español.
Tell Danny about the floor
Send a few lines about the room and the look you want. Danny will call and set up a time to see it.