Epoxy floors for Neshanic homes and shops
More of the homes in Neshanic were built in the 1960s than in any other decade. Garage and basement slabs from those decades often carry old paint or tile that gets ground off first.

Neshanic’s 1960s houses
Neshanic is a community in Hillsborough Township, Somerset County, New Jersey.
The Census counts about 218 homes in Neshanic, with a median build year of 1962.
Sources: US Census Bureau, American Community Survey 2024 5-year survey, for Neshanic, NJ; FEMA National Flood Insurance Program claims, 1978 to 2026, for Hillsborough Township.
Next stops from Neshanic
- Flagtown1.6 mi northeast
- Neshanic Station2 mi northwest
- Hillsborough3.1 mi east
- Belle Mead3.9 mi southeast
- Three Bridges4.7 mi west
- Harlingen4.8 mi southeast
Every town in Somerset County is on the Somerset County page.
What Neshanic’s housing means for the floor
Postwar slabs were often poured right on the soil with no plastic sheet underneath, so moisture is the first thing Danny checks in a house from those years.
Two-car garages became standard on many houses built around this time, which means more floor and more of it exposed to winter road salt. Salt eats at the top of the concrete near the door and under where cars park, leaving a rough, flaking surface called spalling. Before any coating, those areas get ground down and rebuilt with repair mortar. Flake is the usual pick here, since it adds grip and hides the sand that comes in every winter.
Floors for Neshanic’s 1960s houses
All 380 services- Concrete Moisture TestingMeasuring the moisture in a slab before the floor is chosen, then matching the primer and system to the reading and the product data.
- Garage Floor Coating RemovalGrinding failed paint, DIY kits and old epoxy off garage floors down to clean concrete, ready for a new system to bond.
- Basement Epoxy FlooringBasement floors with personality, often a metallic under recessed lights, poured on a dry slab for bars, media rooms and playrooms.
- Solid-Color Garage Floor CoatingSolid-color garage coatings in one even color, ground flush for a clean look, with optional stall lines and grit for traction.
- Sunroom Concrete Floor CoatingCoated sunroom slabs with a topcoat picked for heavy daylight, leveled where old porch floors slope and finished to suit the view.
- Two-Tone Epoxy FlooringA floor split into two colors, as borders, walkways or separate zones, laid out around how a garage, shop or basement actually gets used.
Questions about Neshanic
How far is Neshanic from Danny’s shop?
About 24 miles southwest of Cranford. Flagtown is the closest town to it on Danny’s list.
How old are the houses in Neshanic?
The Census puts the median build year in Neshanic at 1962. More of them went up in the 1960s than in any other decade. Slabs from those years were often poured on bare soil, so Danny tests for moisture before choosing a primer.
What do FEMA’s flood records show for Hillsborough Township?
FEMA’s flood insurance records show 222 claims from Hillsborough Township since 1978, the most after Hurricane Irene in 2011 (57). FEMA files Neshanic under Hillsborough Township, so the count covers all of Hillsborough Township, not Neshanic alone.
What should I have ready before Danny arrives to start?
An empty room. Cars, shelves, bikes and boxes all need to be out, along with anything stored against the walls. Power close to the floor helps, and so does a clear path from the driveway or the curb for the grinder. For a basement, running a dehumidifier for a few days beforehand is worth the trouble.
How do I get on Danny’s schedule for a floor in Neshanic?
Call (908) 577-7104 or send a note through the contact page with the room, its rough size and a few photos if you have them. Danny calls back, asks a few questions and sets a walkthrough. The pour date gets picked after he has seen the slab, because the prep on that particular floor decides how long the job runs.
Do you do commercial floors around Neshanic?
Yes. Danny pours floors for businesses as well as homes. On a commercial job he looks at the foot traffic, what gets spilled and how the floor is cleaned, and he asks how long the space can close. The system is picked to fit what the business needs, and the schedule is agreed with the owner before any grinding starts.
How long will the room be out of use?
It depends on the size of the floor, how much prep it needs and which system goes down. Danny lays out the timing at the walkthrough, including when you can walk on the floor and when a car can come back in, since temperature and humidity change those answers. Plan on the space being empty for the whole job.
What if my floor already has paint or an old coating on it?
It comes off. Danny grinds old paint, failed coatings, tile glue and sealers down to bare concrete, because the new floor has to bond to the slab itself. On the walk he checks how much is there and whether any of it hides damage. Mention anything you know about the floor’s history, since it can change the prep.
Do you pour epoxy countertops too?
Yes. Epoxy countertops are part of what Danny does, and they get the same attention to color and movement as his metallic floors. The design is worked out first, with samples, so the finished top looks like what you pictured. Call to describe the counter and the room it is in, and he will set a time to see it.
How do we settle on colors for a metallic floor?
Danny starts with the picture in your head, then holds real samples next to your walls, cabinets and lighting. Metallic floors move, so he explains how the color will flow and where it tends to gather. His job is to get into your vision and keep it from heading in ten directions at once. Once the design is set, the pour follows that plan.
Danz Handz
Danny Carrero, epoxy specialist
dhepoxy@gmail.com
Cranford, NJ. Mon to Sat, 8 to 6. Hablamos español.
Schedule a look at your floor
Tell Danny about the floor. He calls back and comes out from Cranford, 24 miles southwest, to look at it.